Akasa Air QP1545

Mumbai to Bengaluru

Wed, Jan 14
Sat, Jan 24

Access extensive flight status info directly on the app!

Arrived

BOM
Mumbai, Wed, Jan 14
9:46 PM
Scheduled: 7:50 PM
Check-in
--
Terminal
T1
Gate
9
departured icon
Departure
Flight time: 1h 50m
arrived icon
Arrival
BLR
Bengaluru, Wed, Jan 14
11:04 PM
Scheduled: 9:40 PM
Baggage
6B
Terminal
T1
Gate
A3

Access extensive flight status info directly on the app!

Delayed

Delayed by 45m

BOM
Mumbai, Sat, Jan 24
6:35 PM
Scheduled: 5:50 PM
Check-in
--
Terminal
T1
Gate
27
waiting to departure icon
Departure
Flight time: 1h 50m
haven't arrived icon
Arrival
BLR
Bengaluru, Sat, Jan 24
7:51 PM
Scheduled: 7:40 PM
Baggage
4
Terminal
T1
Gate
--
Download app to track flight status
Google Play
4.8
504k reviews
App Store
4.9
36.2k reviews
Download app to track flight status

QP1545 flight details

The aircraft model for flight QP1545 is Boeing 737 MAX 8, operated by Akasa Air, and features Up to 193 seats.
Airline: Akasa Air Boeing 737 MAX 8 Boeing 737 MAX 8
Airline: Akasa Air
Distance flown: --
Age: 3y, 1m
Seats: Up to 193
Meal service: available
Wi-Fi: Available
USB port: Available
Entertainment: available
Recline angle: 100°
Seat width: 46 cm
Legroom: 76 cm

QP1545 flight schedules

Flight QP1545's latest flight is scheduled to depart at Fri, Jan 9 5:20 PM (local time) and arrive at Fri, Jan 9 7:50 PM (local time). The latest flight information is provided by Whatflytime.
Date Route Departure Arrival Aircraft Status
Fri, Jan 9 BOM - BLR
Actual: 6:00 PM
Scheduled: 5:20 PM
Actual:
Scheduled: 7:10 PM
Boeing 737 MAX 8 En route
Wed, Jan 14 BOM - BLR
Actual: 9:46 PM
Scheduled: 7:50 PM
Actual: 11:04 PM
Scheduled: 9:40 PM
Boeing 737 MAX 8 Arrived
Sat, Jan 24 BOM - BLR
Actual:
Scheduled: 5:50 PM
Actual:
Scheduled: 7:40 PM
Boeing 737 MAX 8 Delayed
Date Departure Arrival Status
Fri, Jan 9
Actual: 6:00 PM
Scheduled: 5:20 PM
Actual:
Scheduled: 7:10 PM
En route
Wed, Jan 14
Actual: 9:46 PM
Scheduled: 7:50 PM
Actual: 11:04 PM
Scheduled: 9:40 PM
Arrived
Sat, Jan 24
Actual:
Scheduled: 5:50 PM
Actual:
Scheduled: 7:40 PM
Delayed

QP1545 punctuality rate

QP1545 will depart from Chhatrapati Shivaji Maharaj International Airport at Fri, Jan 9 5:20 PM, arriving at Kempegowda International Airport at Fri, Jan 9 7:50 PM. The recent on-time departure rate is 0%. The recent on-time arrival rate is 0%. The average delay is 1h 18m.
BOM (Chhatrapati Shivaji Maharaj International Airport) - BLR (Kempegowda International Airport)
  • Departure:
    0% on time
  • Arrival:
    0% on time
  • Average delay:
    78min
Delayed
96m
72m
48m
24m
On time
9 Jan
14 Jan
QP1545
Whatflytime is a global flight tracker that provides real-time status updates using trusted data from Trip.com. With multilingual support and worldwide coverage, it's your reliable source for up-to-date flight information.
Current language: Philippine English